National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
Shake, Rattle, and Roll
The Norwegian Geotechnical Institute (NGI) is an international center for research and consulting that investigates ...
MRI 装置における医療機器の高周波誘導加熱について
医療機器業界の総合的な受託研究機関 (CRO) である MED Institute Inc. は, MRI システムにおける機器の RF 加熱を計算モデリングとシミュレーションで解析し, 患者へのリスクを最小限に抑えています.
ダリエス水車で発電し魚を守る
Physixfactor社は, シミュレーションを利用して, オランダの沿岸部の洪水対策に使用する水車タービンの設計をシミュレーションで行いました. 従来の水力発電用タービンと比較して, 新しいタービン設計では魚の死亡率が20%から1 ...
Helicon Antenna Supports Nuclear Fusion
Built by engineers at General Atomics, the DIII-D tokamak needs to achieve temperatures that are 10 times hotter than ...
