National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
音の姿: エンクロージャーの設計がスピーカーの性能に与える影響を明らかにする
L-Acoustics は, アリーナやコンサートホールの音響システムに使用するバスレフ型スピーカーの最適化に, 音響シミュレーションを活用しています. 設計の進化を加速させるために, ...
COMSOL Assists Master Chef in Winning International Competition
Nofima is a research group majority owned by the Ministry of Fisheries that performs research and development in ...
Tiptoeing Through the Tulips to Protect Power Plants
ABB, a multinational leader in electrification products and power grid technology, develops generator circuit ...
数値モデリングによる環境に優しいアノードベーキングプロセスの設計
アルミはHall–Héroultプロセスを通して抽出されます. その過程で環境にやさしいアノードを使ってボーキサイトから除去されます. ...
