Discussion Closed This discussion was created more than 6 months ago and has been closed. To start a new discussion with a link back to this one, click here.
Update solution after extension of time
Posted 2012/05/26 4:59 GMT-4 2 Replies
Please login with a confirmed email address before reporting spam
Hello,
If I leave my entire model identical, but change the time dependent solver to run to a longer time (same initial time, same time step) and then hit "Update Solution", how can I make COMSOL use the existing solution up to the previous maximum time, and only calculate the times after this? From the "Progress" tab it appears to be calculating the entire solution again.
Thanks for any help,
Andrew
If I leave my entire model identical, but change the time dependent solver to run to a longer time (same initial time, same time step) and then hit "Update Solution", how can I make COMSOL use the existing solution up to the previous maximum time, and only calculate the times after this? From the "Progress" tab it appears to be calculating the entire solution again.
Thanks for any help,
Andrew
2 Replies Last Post 2015/10/07 4:47 GMT-4