National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
Keeping LEDs Cool Gets More Manageable Through Simulation
Light-emitting diodes (LEDs) offer many benefits over incandescent lighting, such as long life spans and high luminous ...
ITW はマルチフィジックスシミュレーションを使用して賢い電子レンジオーブンを設計します
固体熱伝導加熱を備えた「スマートオーブン」を設計するために, Illinois Tool Works (ITW) 食品機器グループのエンジニアはマルチフィジックスシミュレーションと特殊なアプリケーションに目を向けました. ...
Keeping Cool: SRON Develops Thermal Calibration System for Deep-Space Telescope
Deep-space telescopes require ultrasensitive detectors and calibration to pick up weak far-infrared signals. The SpicA ...
Analysis of Subsea Umbilicals and Cables
JDR Cables designs-to-spec and manufactures subsea umbilical systems of cables and reelers for the oil and gas and ...
